DescriptionFixed resource management
Lead
Support
Status
StatusComment
Green

Last update: 14.04.2023

Progressing according to plan. No impediments

Introduction

This page is concerned with defining the data flows between AODB and Fixed Resource Management systems, in either direction. A "Fixed Resource" is defined as one which is always physically located in the same place, the following is a non-exhaustive list of such assets :

ResourceNotes
TerminalNot at all airports. Likely to be fixed by the airline
GateAllocated per flight (the service which a passenger buys a ticket for). May be determined by the stand, but there may not be a 1:1 relationship with the stands
StandAllocated per aircraft
Reclaim carouselThe place where arrival passengers collect their bags
Make-up Carousel / LateralA belt which carries bags around until a handler is able to pick it up and load into a ULD
Security LaneFor departing passengers
Check-in DeskMay be allocated to specific flight(s), or for an airline or alliance for a period of time. May also be segregated by passenger class
Transfer Desk
De-Icing PadUsed for aircraft at some airports  
De-Icing LaneUsed for aircraft at some airports
Runway*May be outside of the scope of the airport, depending on operational procedure
SID*May be outside of the scope of the airport, depending on operational procedure


Note that the scope here does not include non-fixed resources such as luggage trolleys and taxis, nor does it include human resources such as security staff.


Actions

Use Cases

ID

FixedResource_UC001

Title

Create flight resource allocation

Description

Allocate a fixed resource to a flight or an aircraft movement, for a defined period of time. The resource should then be visible in the flight record

ID

FixedResource_UC002

Title

Create resource allocation

Description

Allocate a fixed resource for a defined period of time. The resource is allocated to a piece of work which may be multiple flights (e.g. a check-in counter), one flight (e.g. a stand), zero flights (e.g. a gate outage), or unrelated to flights. 

ID

FixedResource_UC003

Title

Update flight resource allocation

Description

Update the allocation of a fixed resource to a flight, changing either the period of time, or the resource assigned to it. The status of the allocation may also be changed e.g. to "Provisional", "Pending", "Cancelled" etc.

 

ID

FixedResource_UC004

Title

Update resource allocation

Description

Update the allocation of a fixed resource, changing either the period of time, or the work(s) assigned to it. The status of the allocation may also be changed e.g. to "Provisional", "Pending", "Cancelled" etc..

 

ID

FixedResource_UC005

Title

Delete flight resource allocation

Description

Remove the allocation of a fixed resource to a flight for a defined period of time, so that the allocation is no longer visible in the flight record. 

 

ID

FixedResource_UC006

Title

Delete resource allocation

Description

Remove the allocation of a fixed resource. 

 

ID

FixedResource_UC007

Title

Create resource restriction

Description

Allocate a restriction to a fixed resource for a defined period of time, so that flights may only use it within that restriction (e.g. a stand can be used but not with a jet bridge)

 

 

User Stories

N.B. The updating, removal etc. of planning rules happens within the resource allocation tool does not involve data exchange so is not considered here.

Data Objects, formats, intervals

Data Element definitions


Terms

The following are terms which require a link to an existing ACRIS definition, or for one to be created:

Would be useful to have a definition of "Piece of work" which allocations can be attached to- this may be multiple flights (e.g. the thing a checkin counter is allocated to), one flight (e.g. for a stand), zero flights (e.g. a gate outage), or unrelated to flights (e.g. bathroom cleaning)

Possible definition of terms such as "Provisional", "Pending", "Cancelled"?